项目

美国坎布里亚郡塞拉菲尔德有限公司.K.

长期支持项目

图片由Sellafield Ltd提供

图片由Sellafield Ltd提供

美国的先驱.K.核工业, 塞拉菲尔德支持国防, generated electricity for nearly half a century and developed the ability to safely manage nuclear waste – delivering great benefit, while also creating a complex nuclear cleanup challenge for which there aren’t any blueprints. 

我们已经工作了40多年来指导塞拉菲尔德的安全退役, 废物管理和环境修复.

  • 40 +

    多年指导安全退役、废物管理 & 环境修复

  • 200 +

    核设施和世界上最大的未经处理核废料库存

焦点:Sellafield Ltd

塞拉菲尔德的清理任务具有国际重要性

雅各布斯已经为塞拉菲尔德核电站的安全退役工作了40多年, 废物管理和环境修复. 作为项目和项目合作伙伴(PPP),负责设计和工程, 并作为AXIOM合资企业的成员, we work in integrated teams with Sellafield Ltd and supply chain partners under the Design Services Alliance (DSA) framework. 在整个采购过程中使用更智能的工作方式, 范围, 设计, 系统和精益技术的使用, the DSA has helped deliver client-approved savings of more than £140 million ($150M) since 2012.

与Sellafield Ltd和合作伙伴一起工作, 根据购买力平价, we’re providing engineering 设计 on vital hazard reduction projects over the next 20 years. Our hazard reduction experience at Sellafield also includes waste retrievals from the Magnox Swarf Storage Silo, 该遗址的遗留设施之一. 在这里, 我们帮助安装了第一台筒仓排空设备(SEP), 退役过程中的一个重要里程碑.

现在, we’ve even developed a unique capability for the retrieval of radioactive waste and sludge in extreme environments to support the site’s First-Generation Magnox Storage Pond program – one of the highest nuclear risks in Europe. We 设计ed a bespoke package with remotely operated equipment to enable Sellafield to achieve greater control over the pond’s water level and make it easier to retrieve waste for treatment and storage. ACKtiv核, 由雅各布斯领导的合资企业, collaborated with Sellafield Ltd and supply chain partners to achieve the first bulk sludge transfer from the FGMSP to a new containment facility. 这是美国减少灾害的一个重大里程碑.K. 核工业和是10年的规划和准备的高潮.

自2012年以来, 正规博彩十大网站排名 has delivered engineering 设计 and safety case services to Sellafield Ltd as part of the Design Services Alliance (DSA). 到2021年年中,支出已达到10亿英镑(合10亿美元).380亿美元),DSA合作伙伴交付了现金, 非现金收益和未来收益总计超过2.2亿英镑(3亿美元). 除了, the DSA has helped to make the site safer sooner by cutting 744 months from hazard reduction schedules. 工程设计已经改变了挑战公认的做事方式, 删除不必要的作用域, 让采购更智能, 通过激进的新技术和精益技术来降低成本. DSA的成功得到的回报是它宣布将继续举办第三届选举, 到2027年的五年期债券.

Home to more than 200 核设施和世界上最大的未经处理核废料库存, 塞拉菲尔德的清理任务具有国际重要性 and there’s still much unknown about its decommissioning. 与Sellafield Ltd和合作伙伴一起工作, we’re helping build greater certainty every day and making demonstrable progress to create a legacy for all to enjoy.